Project:
Taman Perindustrian Samalaju (Section B2 Road Package 2)
Status:
- Filling work.
- Embankment cutting
- Preparation for static load test
- CH0+000, Road 1&2 Package 2
- Embankment filling at CH0+750
- Preparation of static load test
- View at CH0+975 to end chainage