General Information
The project consists of :
- 66 KM access road
- 11 nos. of bridge
- 5 packages namely Package A1, B1, B2, C2 and C1&3
Standard of Road:
- JKR R3 Road Standard with asphaltic concrete road pavement
- 2 lanes 2 ways road with 3m width per lane
- Package A1
- Package A1 – Junction A1 (CH0)
- Bridge over Sg. Penyan (CH1+680 )
- Slope stabilization works at CH9+900
- CH5+300 backward
- Package B2 – CH 21 + 200 backward
- Package B2 – CH 19 plus 900 forward
- Package C3