Access road to Murum HEP

General Information

The project consists of :

  • 66 KM access road
  • 11 nos. of bridge
  • 5 packages namely Package A1, B1, B2, C2 and C1&3

Standard of Road:

  • JKR R3 Road Standard with asphaltic concrete road pavement
  • 2 lanes 2 ways road with 3m width per lane